STARBUCKS audit grade decision

First, the rating


Grade A - Three years validity, the factory meets most standards and establishes a system to find and manage problems in the workplace.


Grade B - 2 years of validity, no serious problems, in particular, there is no salary, fire safety, working hours and industry relations issues.


Grade C - 18 months validity, factory has some problems. To take continuous improvement measures to provide a one-year quarterly rectification plan management support


Grade D - 1 year validity, providing one-year quarterly rectification plan management support


F grade - 6 months validity, providing one-year quarterly rectification plan management support


Zero Tolerance - 0 months validity, does not provide new business opportunities


For Starbucks buyers grade decision requirements, Shanghai Super net small super think first-instance suppliers can reach D-class, and then continue to improve, and strive to C-level standards in the direction of efforts!


Second, zero tolerance standards


1, transparency


2, bribe


3, subcontracting


4, make a commitment to continuous improvement


5, refused to visit


6, payroll


7, child labor


8, forced labor


9, abuse and harassment


10. Environmental Impact: For example, the supplier / factory has not caused major environmental problems that directly and immediately endanger the environment. For example: toxic waste disposal, or improper sewage treatment.


11, life safety


1), the supplier factory did not create a major health and safety hazard that directly and immediately jeopardized the lives of employees.


Regarding the zero-tolerance policy of Starbucks purchasers, Shanghai SuperNet believes that the fire protection requirements are still the top priority, such as the second safety exit issue, the fire / evacuation alarm system problem, the safety exit blocked or locked (including the escape ladder Exit is locked), all elevators are not in use, the wellhead is open and the proper signs are not set, the equipment is improperly installed or used, the equipment is not repaired or tested, the electrical equipment causes arcing or sparks, and the circuit is overloaded to cause the cable And the device is overheated, the cables are bundled or rolled up, or the cooling fan is damaged.